Selected projects across 5 countries showcasing our expertise and commitment to excellence.
We delivered Embu Tower, a 14-floor mixed-use development with offices, retail, and residential units. Project cost KSh 1B, enhancing Embu’s urban lifestyle and infrastructure.
Mixed-use development in Syokimau with shops, 300 homes, and landscaped courtyards, offering vibrant community living. Valued at ~1.5B, completion expected in 2026.
Unity One features stylish one-bedroom apartments in Tatu City, integrated with amenities like a gym and a pool.
We designed footpaths and performance stages for this heritage-listed former blast furnace.
We carried out a structural integrity assessment of the service station and recommended the replacement of degraded structural elements.
We carried out structural compliance ceiling inspections of Erskineville, Surry Hills and Pyrmont Woolworths Metro stores.
We checked the adequacy and certified the slab for core hole penetrations and floor boxes.
Santana, Kisauni’s first modern gated community—810 homes, shops, amenities, completing 2026.
We designed the steel structure of the KFC building and the basement below. The basement is designed to act as a flood storage tank.
Silver Hill, a 6-acre master community in Tatu City with 100 Georgian-style 3-bed all-ensuite townhouses. Estimated cost KES 2B, completion in 2025.
We supervised the construction of this service center. It includes two service stations, restaurants, rest areas and sewerage works. Construction is still ongoing.
576 modern 2-bedroom apartments (expandable), with balconies, contemporary kitchens, and luxury amenities including a pool and a gym.
Unity West in Tatu City is a modern, family-friendly low-rise estate on 7 acres with park views and outdoor amenities. 384 units, completed Q1 2022, approx. KES 800M.
We designed the home remodelling through retrofitting to create more open space around the living room and kitchen area.
We delivered Nyeri Plaza, an 8-floor mixed-use development with retail, offices, and residential units. Project cost KSh 400M, enhancing Nyeri’s urban living and business environment.
We designed the structure of terminals 1B, 1C and 1D in 2018
We conducted structural integrity assessments, supervised slab scans and checked the adequacy of the building to support swing stage and scaffolding loads. The project’s objective is to replace the combustible cladding (ACP).
Unity East, 640 affordable apartments with modern kitchens, glass-railed balconies, and panoramic park views. Estimated cost KES 1.4B, completion in 2024.
Let's discuss how we can bring your vision to life